Issue |
BIO Web Conf.
Volume 107, 2024
19th International Conference Water and Wastewater: Transportation, Treatment, Management “Yakovlev Readings” (YRC-2024)
|
|
---|---|---|
Article Number | 06005 | |
Number of page(s) | 8 | |
Section | Technology and Organization of Construction | |
DOI | https://doi.org/10.1051/bioconf/202410706005 | |
Published online | 07 May 2024 |
A typical digital model of the construction process
Moscow State University of Civil Engineering, 26, Yaroslavskoye shosse, Moscow, 129337, Russia
* Corresponding author: kabanovvn@yandex.ru
Based on the practical experience of developing digital models of technological processes for the production of construction and installation works, a hypothesis about the similarity of digital models of construction processes is formulated. To prove the existence of this hypothesis, studies have been carried out, the purpose of which is to typify digital models of construction processes. When constructing a typical digital model of the construction process, the conceptual apparatus is clarified, mathematical models are proposed, which are most often found in the practice of modeling. The practical application of a typical digital model of the construction process greatly simplifies the processes of software development (computer codes), can be used to automate procedures that are used in the preparation of working organizational and technological documentation. In addition, standard digital models can be used to find such solutions for construction production that reduce the duration of construction and installation work with a significant reduction in cost.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.