Issue |
BIO Web Conf.
Volume 105, 2024
IV International Conference on Agricultural Engineering and Green Infrastructure for Sustainable Development (AEGISD-IV 2024)
|
|
---|---|---|
Article Number | 01003 | |
Number of page(s) | 7 | |
Section | Agricultural Machinery and Power Units, Green Energy Systems | |
DOI | https://doi.org/10.1051/bioconf/202410501003 | |
Published online | 26 April 2024 |
Current state and approaches to automation of central heating stations at industrial enterprises
1 Higher School of Technology and Energy, Saint-Petersburg State University of Industrial Technologies and Design, Saint-Petersburg, 191186, Russia
2 Kazan Federal University, Kazan, 420008, Russia
3 Saint-Petersburg State Forest Technical University, Saint-Petersburg, 194021, Russia
4 Baltic State Technical University “Voenmeh” named after. D.F. Ustinov, Saint Petersburg, 190005, Russia
* Corresponding author: sgorobchenko@yandex.ru
The paper examines the problems of forming technical requirements for the automation of central heating points of fuel and energy complex enterprises. The main technological schemes that are subject to automation are considered, the basic requirements for the installation of technical automation equipment are shown, the basic requirements are identified based on modern concepts for constructing automated control systems, and the main adjustable and controlled parameters of the central heating station for the main application in State Unitary Enterprise “Fuel and Energy Complex” are clarified.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.