Open Access
Issue |
BIO Web Conf.
Volume 89, 2024
The 4th Sustainability and Resilience of Coastal Management (SRCM 2023)
|
|
---|---|---|
Article Number | 06002 | |
Number of page(s) | 15 | |
Section | Sustainable Construction | |
DOI | https://doi.org/10.1051/bioconf/20248906002 | |
Published online | 23 January 2024 |
- Amalia Dyah Utami, N. (2019). Optimasi Operasi Alat Angkut Batubara Dari Stockpile Ke Pelabuhan (Studi Kasus: Pt Bara Tabang, Desa Gunung Sari, Kecamatan Tabang, Kabupaten Kutai Kartanegara, Kalimantan Timur). In Repository.Uinjkt.Ac.Id. https://repository.uinjkt.ac.id/dspace/handle/123456789/47747 [Google Scholar]
- Asare, T. J. (2022). Safe use of road construction tools, machinery and equipment on site. Central European Management Journal, 30, 798–808. https://doi.org/10.57030/23364890.cemj.30.4.76 [Google Scholar]
- Bao, Y., Guo, C., Zhang, J., Wu, J., Pang, S., & Zhang, Z. (2018). Impact analysis of human factors on power system operation reliability. Journal of Modern Power Systems and Clean Energy, 6(1), 27–39. https://doi.org/10.1007/s40565-016-0231-6 [CrossRef] [Google Scholar]
- Cavallaro, F., & Nocera, S. (2023). Flexible-route integrated passenger–freight transport in rural areas. Transportation Research Part A: Policy and Practice, 169(103604). [CrossRef] [Google Scholar]
- Dight, P., Douglas, B., Henley, K., Lumley, G., McAree, P., Miller, D., Saydam, S., Topal, E., Wesseloo, J., & Williams, D. (2013). Developments in open cut mining. Australasian Mining and Metallurgical Operating Practices, 47–80. [Google Scholar]
- Febrinaldi, E., & Anaperta, Y. M. (2021). Evaluasi Jalan Tambang Untuk Meningkatkan Produksi dari Pit A 1 B Ke Evortable Finish Ore (EFO) Di PT Paramitha Persada Tama Blok Kerja PT Bintang Delapan Resources. Jurnal Bina Tambang, 6(5), 17–32. [Google Scholar]
- H. Samad. (2019). Overdimensi Dan Overloading Lalu Lintas Kendaraan Angkutan Barang Melalui Suatu Uji Penimbangan Kendaraan Bermotor Di Maccopa Kabupaten Maros. Doctoral Dissertation, Universitas Hasanuddin. [Google Scholar]
- Hansen, S., & Sjöström, R. (2023). Challenges for the Construction Equipment Industry to Shift Towards Zero-Emission Machines. [Google Scholar]
- Haseeb, J. (2007). Applications of Hydrology in Civil Engineering. [Google Scholar]
- Herdiansyah, S., Zaenal, & Iswandaru. (2022). Kajian Teknis Geometri Jalan Tambang untuk Mengurangi Dampak Slippery sebagai Upaya Meningkatkan Produksi Nikel PT ANTAM (Persero) Tbk di Kecamatan Maba, Kabupaten Halmahera Timur, Provinsi Maluku Utara. Bandung Conference Series: Mining Engineering, 2(2), 441–447. https://doi.org/10.29313/bcsme.v2i2.4018 [CrossRef] [Google Scholar]
- Hia, S., Singgih, M., & Gurning, R. O. S. (2022). Transportation Performance Measurement for Coal Mining: A Review and Framework. In Proceedings of the International Conference on Industrial Engineering and Operations Management Istanbul, Turkey, 10, 3391–3398. [Google Scholar]
- Higson, J. L., & Singer, M. B. (2015). The impact of the streamflow hydrograph on sediment supply from terrace erosion. Geomorphology, 248, 475–488. [CrossRef] [Google Scholar]
- Jati, H. A., Monei, N., Barakos, G., Tost, M., & Hitch, M. (2021). Coal slurry pipelines: A coal transportation method in Kalimantan, Indonesia. International Journal of Mining, Reclamation and Environment, 35(9), 638–655. https://doi.org/10.1080/17480930.2021.1949857 [CrossRef] [Google Scholar]
- Kaufman, W., & J, J. A. (1978). Design of surface mine haulage roads: a manual. 8758(Department of the Interior, Bureau of Mines.). [Google Scholar]
- Liu, P., Zhang, R., Yin, Z., & Li, Z. (2021). Human errors and human reliability. Handbook of Human Factors and Ergonomics, 514–572. [Google Scholar]
- Mathematics, A. (2016). 済無No Title No Title No Title. [Google Scholar]
- Meita, T., Murad, M., & Syahrudin, S. (2023). Optimasi waktu edar pada kegiatan hauling menggunakan teori antrian di PT Gilgal Batu Alam Lestari. Jurnal Himasapta, 8(1), 47. https://doi.org/10.20527/jhs.v8i1.8727 [CrossRef] [Google Scholar]
- Mielli, F. (2013). The Central Control Room: Improving Mine Operational Performance. Engineering and Mining Journal, 214(7), 30. [Google Scholar]
- Mustofa, A., Mardana, T. I., & Melati, S. (2020). Evaluasi Kegiatan Coal Hauling Untuk Menunjang Ketercapaian Target Produksi Pt Tamtama Perkasa. Jurnal GEOSAPTA, 6(2), 85. https://doi.org/10.20527/jg.v6i2.8747 [CrossRef] [Google Scholar]
- National Mental Health Benchmarking Project - Forensic. (2008). Review of Key Performance Indicators. https://www.amhocn.org/publications/forensic-benchmarking-forum-review-kpis [Google Scholar]
- Natural Resources Institute. (1994). Chapter I: Introduction. In Handbook for Agrohydrology. [Google Scholar]
- Neenu, S. (2020). Engineering Hidrology Features and Application. The Constructor. [Google Scholar]
- Pemerintah Republik Indonesia. (2020). Undang-Undang Nomor 3 Tahun 2020. Pemerintah Republik Indonesia,. Pemerintah Republik Indonesia, 036360. [Google Scholar]
- Pradana, M. A., Sidiq, H., Studi, P., Pertambangan, T., Mineral, F. T., Barat, K. M., & Lahat, K. (2022). Penambangan Batubara. 03(01), 53–62. [Google Scholar]
- Prasetia, I. (2023). Risk Analysis of Coal Hauling Road Upgrade Project at PT. Borneo Indobara to Support Sustainable Development. In IOP Conference Series: Earth and Environmental Science, 1184(1), 012020. [CrossRef] [Google Scholar]
- Puzyrevskaya, A., Pogotovkina, N., Gorchakov, Y., & Ovsyannikov, V. . (2022). Shortening unscheduled downtime for more efficient use of haul trucks. In IOP Conference Series: Earth and Environmental Science, 988(4), 042036. [CrossRef] [Google Scholar]
- Rianta, M. (2022). Mengenal Metode Surface Mining pada Pertambangan Batubara. [Google Scholar]
- Rija, S., & Anaperta, Y. . (2020). Optimalisasi Peralatan Tambang dengan Metoda Overall Equipment Effectiveness (OEE) untuk Memenuhi Target Produksi Pengupasan Overbuden Bulan Agustus 2019 di Pit 1 Utara Bangko Barat PT. Satria Bahana Sarana Tanjung Enim Sumatera Selatan. Bina Tambang, 5(3), 102–110. [Google Scholar]
- Shabrina, P., & Saliman, H. (2020). Optimasi Kemampuan Kerja Alat Gali dan Angkut Untuk Perencanan Fleet Management. Indonesia Mining and Energy Journal, 3(1), 10–16. [Google Scholar]
- Sidabutar, G. (2019). Metodologi Perancangan Jalan Angkut Batubara Dari Aspek Sipil Dan Manajemen Keselamatan Di Pt Lahai Coal. Prosiding Temu Profesi Tahunan PERHAPI, 1(1), 61–74. https://doi.org/10.36986/ptptp.v0i0.6 [CrossRef] [Google Scholar]
- Sirait, B. (2021). Pavement Design of Coal Mine Hauling Road in Indonesia using California Bearing Ratio (CBR) data. IOP Conference Series: Earth and Environmental Science, 789(1). https://doi.org/10.1088/1755-1315/789/1/012075 [Google Scholar]
- Spring, N., Ib, M. B. A., Answered, G. C., & Firstname, E. (2023). Problem Set 1 Individual Assessment - 25 % Your Submission Question 1. 1–8. [Google Scholar]
- Sugiyono. (2018). Metode Penelitian Kuantitatif, Kualitatif. Bandung:(Alfabeta). [Google Scholar]
- Tambunan, A. R. R. (2022). EVALUASI ALAT MUAT DAN ALAT ANGKUT UNTUK M E N I N G K A T K A N P R O D U K T I V I T A S B A T U B A R A DI S I T E M T B U P T . B U K I T A S A M , T B K TANJUNG ENIM SUMATERA SELATAN ABSTRAK. 04(01). [Google Scholar]
- Tlhatlhetji, M., & Kolapo, P. (2021). Investigating the effects of rainy season on open cast mining operation: The case of Wescoal Khanyisa Colliery. [Google Scholar]
- Tannant, D. D., & Regensburg, B. (2001). Guidelines for mine haul road design. [Google Scholar]
- Thompson, R. ., & Visser, A. . (1996). Towards a mechanistic structural design method for surface mine haul roads. Journal of the South African Institution of Civil Engineers, 38(2), 13–20. [Google Scholar]
- Wang, X., Li, S., & T. Tang. (2019). Periodically intermittent cruise control of heavy haul train with uncertain parameters. Journal of the Franklin Institute, 356(13), 6989–7008. [CrossRef] [Google Scholar]
- Water Science School. (2020). What is Hydrology? [Google Scholar]
- Yuniar, D., Djakfar, L., Wicaksono, A., & Efendi, A. (2020). Travel time optimization of coal-hauling based on special road topography and environment. Journal of Green Engineering, 10(10), 9789–9800. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.