Open Access
Issue |
BIO Web Conf.
Volume 107, 2024
19th International Conference Water and Wastewater: Transportation, Treatment, Management “Yakovlev Readings” (YRC-2024)
|
|
---|---|---|
Article Number | 06009 | |
Number of page(s) | 9 | |
Section | Technology and Organization of Construction | |
DOI | https://doi.org/10.1051/bioconf/202410706009 | |
Published online | 07 May 2024 |
- Q. He, W. Jiang, Y. Li and Y. Le, The study on paradigm shift of project management based on complexity science -project management innovations in Shanghai 2010 EXPO construction program, IEEE International Conference on Industrial Engineering and Engineering Management, Hong Kong, China, (2009), pp. 603-607. [Google Scholar]
- A. Bilau, E. Witt, An analysis of issues for the management of post-disaster housing reconstruction, International Journal of Strategic Property Management, (2016), 20, pp.265-276. [CrossRef] [Google Scholar]
- T. Ophiyandri, D. Amaratunga, C. Pathirage and K. Keraminiyage, Critical success factors for community-based post-disaster housing reconstruction projects in the pre-construction stage in Indonesia, International Journal of Disaster Resilience in the Built Environment, (2013), 4, pp.236-249. [CrossRef] [Google Scholar]
- L. Liu, J. Liu, Experience of the Post-Disaster Housing Rehabilitation and Reconstruction in Wudu District, Longnan City, In Proceedings of the 17th International Symposium on Advancement of Construction Management and Real Estate, Springer, 2014, Berlin, Germany, (2014), 127, pp. 709-714. [Google Scholar]
- A. Bilau, E. Witt, I. Lill, A Framework for Managing Post-disaster Housing Reconstruction. Procedia Economics and Finance, (2015), 21, pp. 313–320. [CrossRef] [Google Scholar]
- L. Crawford, C. Langston and B. Bajracharya, Building capability for disaster resilience, Association of Researchers in Construction Management in Smith, Proceedings of the 28th Annual Conference, 3-5 September 2012, Edinburgh (2012) , pp. 123-132. [Google Scholar]
- B. Norling, Effective time management in post-disaster reconstruction, Australian and New Zealand Disaster and Emergency Management Conference, Australia (2013), pp.1-10. [Google Scholar]
- P. Oleynik and A. Maaruf, Methodology for Assessing the Technical Condition of Monolithic-Frame Buildings Damaged by the War in Syria, Stroitel'noe proizvodstvo, (2023), 2, pp. 47-53. [Google Scholar]
- A. Maaruf, Application of BIM and visual programming in the organization of post-conflict reconstruction projects, Inzhenernyj vestnik Dona, (2023), 9, pp. 1-12. [Google Scholar]
- S. Shulzhenko, The organization of rational input of objects taking into account complex preparatory building of territory, Vestnik MGSU, (2011), 1, pp. 262-267. [Google Scholar]
- V. Savchenko, G. Kovtunenko, R. Zakaryan and Shabanov R.N, Integrated development of local urban areas in large cities, The Eurasian Scientific Journal, (2020), 1, pp.1-9. [Google Scholar]
- L. Kievski, Complexity and flow: Organization of micro-districts development, M: Strojizdat, (1987), pp. 136 [Google Scholar]
- L. Kievski and S. Sergeev, Urban planning and labor productivity, ZHilishchnoe stroitel'stvo, (2015), 9, pp. 55-59. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.