Open Access
Issue |
BIO Web Conf.
Volume 107, 2024
19th International Conference Water and Wastewater: Transportation, Treatment, Management “Yakovlev Readings” (YRC-2024)
|
|
---|---|---|
Article Number | 06013 | |
Number of page(s) | 16 | |
Section | Technology and Organization of Construction | |
DOI | https://doi.org/10.1051/bioconf/202410706013 | |
Published online | 07 May 2024 |
- O. V. Bogdanova, D. I. Dokydovskaya, Innovative Methods of 4D Modeling in the Organization of Construction, Engineering Journal of Don, Inž. vestn. Dona, 2 (2018) [Google Scholar]
- M. Lucarelli, E. Laurini, P. De Berardinis, 3D and 4D modelling in building site working control, 8th Intl. Workshop 3D-ARCH “3D Virtual Reconstruction and Visualization of Complex Architectures”, 6–8 February 2019, Bergamo, Italy / The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, XLII-2/W, pp. 441–446 (2020) [Google Scholar]
- P. F. Ahmadi, M. Arashpour, An analysis of 4D-BIM Construction Planning: Advantages, Risks and Challenges, in Proceedings of the 37th International Symposium on Automation and Robotics in Construction, ISARC: From Demonstration to Practical Use – To New Stage of Construction Robot, pp. 163–170 (2020) [Google Scholar]
- O. Doukari, B. Seck, D. Greenwood, The Creation of Construction Schedules in 4D BIM: A Comparison of Conventional and Automated Approaches, Tradition and Innovation in Construction Project Management, 12 (8), p. 1145 (2022) [Google Scholar]
- Yu. V. Gushchina, D. A. Saushkin, Optimization of Calendars with the Help of BIM Modeling, Bulletin of Volgograd State University of Architecture and Civil Engineering, Series: Civil Engineering and Architecture, 4 (81), pp. 438–447 (2020) [Google Scholar]
- A. M. Elsheykh, 4D Visualization of Workspaces During Construction, Modern Problems of Science and Education, 6 (2014) [Google Scholar]
- R. Jongeling, J. Kim, C. Mourgues, M. Fischer, T. Olofsson, Quantitative analysis using 4D models — an explorative study, in C. Park (Ed.), First International Conference on Construction Engineering and Management, Korea Institute of Construction Engineering and Management, Seoul, Korea (2005) [Google Scholar]
- N. P. Chetverik, State-of-the-art system for information management of architecture and construction projects, Science and Safety, 3 (8), pp. 2–6 (2013) [Google Scholar]
- M. V. Matveeva, A. A. A. Adegbola, Organization and Management of 4D-modelling Processes in Construction, Izvestiya vuzov. Investitsii. Stroitelstvo. Nedvizhimost, 12. (2), pp. 190–195 (2022) [CrossRef] [Google Scholar]
- S. A. Bolotin, A.Kh. Dadar, I. S. Ptuhina, Simulation of calendar planning in Building information modelling programms and regression detailing of construction period rules, Magazine of Civil Engineering, 7 (25), pp. 82–86 (2011) [CrossRef] [Google Scholar]
- V. A. Semenov, V. N. Shutkin, N. K. Morozkin, An Effective Approach to 4D Visualization of Large-Scale Construction Projects and Programs Using Hierarchical Dynamic Levels of Detail, in BIM in Construction & Architecture: Proceedings of IV International Conference; SPbGASU, St. Petersburg, pp. 385–393 (2021) [Google Scholar]
- S. I. Pimenov, Analysis of Modern Software for Virtual Construction (4D Modeling), Russian journal of building construction and architecture, 3, pp. 92–104 (2022) [Google Scholar]
- K. A. Khristoforova, V. S. Demidova, D. N. Krivogina, Subject-Oriented Rationale for the Choice of Software for the Implementation of BIM Technologies Compatible with Scheduling and Network Planning in Capital Construction, Engineering Journal of Don, Inž. vestn. Dona, 12 (2021) [Google Scholar]
- V. N. Kabanov, Principles of Building an Information Model of a Separate Construction Process, News of Higher Educational Institutions. Construction, 10, pp. 64–75 (2022) [CrossRef] [Google Scholar]
- T.Yu. Pletnikova, Methodology for the Formation of a 4D-model of the Construction Master Plan During Construction, in BIM in Construction & Architecture: Proceedings of IV International Conference, SPbGASU, St. Petersburg, pp. 239–245 (2022) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.