Open Access
Issue
BIO Web Conf.
Volume 159, 2025
10th International Conference on Sustainable Agriculture, Food, and Energy (SAFE 2024)
Article Number 02009
Number of page(s) 11
Section Sustainability Development and Management
DOI https://doi.org/10.1051/bioconf/202515902009
Published online 05 February 2025
  • Asian Development Bank, “Public-Private Partnership: Development Prospects,” 2018. doi: 10.32702/2306-6814.2020.4.109. [Google Scholar]
  • [2] C. Cui, Y. Liu, A. Hope, and J. Wang, “Review of studies on the public–private partnerships (PPP) for infrastructure projects,” International Journal of Project Management, vol. 36, no. 5, pp. 773–794, 2018, doi: 10.1016/j.ijproman.2018.03.004. [CrossRef] [Google Scholar]
  • [3] B. Rifai, “Hinderence of Electricity Public Private Partnership (PPP) and Need of Policy Improvement,” Journal of Economics and Development, vol. 24, no. 1, pp. 51–66, 2016. [Google Scholar]
  • [4] A. D. Tsvirkun and F. I. Ereshko, “Control models at the public-private partnership (PPP),” Proceedings of 2019 12th International Conference "Management of Large-Scale System Development", MLSD 2019, vol. 0, pp. 1–5, 2019, doi: 10.1109/MLSD.2019.8911011. [Google Scholar]
  • [5] Y. D. Suwandari and A. B. Suratkon, “Investigating The Potential of Cash Waqf for Funding Public Infrastructure Through Public-Private Partnership,” RES MILITARIS, vol. 4, no. 12, pp. 1026–1035, 2022, [Online]. Available: https://www.ptonline.com/articles/how-to-get-better-mfi-results [Google Scholar]
  • [6] Bappenas, Indonesia Public Private Partnership Handbook 2020, no. 1. 2020, pp. 50–66. [Google Scholar]
  • [7] B. S. Sergi, E. G. Popkova, K. V Borzenko, and N. V Przhedetskaya, “Public– Private Partnerships as a Mechanism of Financing Sustainable Development,” Springer, no. July 2020, pp. 313–339, 2019, doi: 10.1007/978-3-030-16522-2_13. [Google Scholar]
  • [8] E. Iossa and S. Saussier, “Public Private Partnerships in Europe for Building and Managing Public Infrastructures: an Economic Perspective,” Annals of Public and Cooperative Economics, vol. 89, no. 1, pp. 25–48, 2018, doi: 10.1111/apce.12192. [CrossRef] [Google Scholar]
  • [9] A. Marx, “Public-Private Partnership for Sustainable Development: Exploring Their Design and Its Impact on Effectiveness,” MDPI, no. February, p. 10, 2019. [Google Scholar]
  • [10] A. Agung Yana, K. Swijana, S. Dewi, A. A. Yana, K. Swijana, and S. Dewi, “Studi Kelayakan Jalan Tol Serpong-Cinere Ditinjau dari Segi Ekonomi dan Finansial,” Jurnal Ilmiah Teknik Sipil, vol. 8, no. 2, 2019. [Google Scholar]
  • [11] E. Gerald and S. Hardjomuljadi, “Analisis Klausa Kontrak Yang Terkait Dengan Klaim Pada FIDIC Condition od Contract 1999,” Jurnal Muara Sains, Teknologi, Kedokteran, dan Ilmu Kesehatan, vol. 5, no. 2, pp. 501–512, 2021. [CrossRef] [Google Scholar]
  • [12] L. A. L. Puteri, B. Susetyo, and A. Suroso, “Peran Pemangku Kepantingan Terhadap Faktor-Faktor Risiko Pada Proyek Kpbu Jalan Tol Unsolicited,” Konstruksia, vol. 14, no. 1, p. 61, 2022, doi: 10.24853/jk.14.1.61-70. [CrossRef] [Google Scholar]
  • [13] A. Amran, “Faktor yang Berpengaruh dalam Penerapan Value Engineering pada Pekerjaan D-Wall di Bangunan Gedung Menggunakan Metoda RII,” Rekayasa Sipil, vol. 8, no. 1, p. 10, 2019, doi: 10.22441/jrs.2019.v08.i1.02. [CrossRef] [Google Scholar]
  • [14] Asian Development Bank, “Public Private Monitor Public Private Monitor Indonesia,” 2020. [Google Scholar]
  • [15] D. A. Wardhani, “Pelaksanaan Public-Private Partnership dalam Perspektif Foreign Direct Investment untuk Pembangunan Infrastruktur,” Jurnal Pengadaan Barang/Jasa, vol. 2, no. 1, pp. 27–37, 2023, doi: 10.55961/jpbj.v2i1.34. [CrossRef] [Google Scholar]
  • [16] S. Hamzah, S. A. Adisasmita, T. Harianto, and M. S. Pallu, “Private Involvement in Sustainable Management of Indonesian Port: Need and Strategy with PPP Scheme,” Procedia Environ Sci, vol. 20, pp. 187–196, 2014, doi: 10.1016/j.proenv.2014.03.025. [CrossRef] [Google Scholar]
  • [17] B. Naipospos and A. Paramita, “Communication to find water intake location within public private partnership between tangerang government authority and PT aetra air tangerang,” Journal of Regional and City Planning, vol. 30, no. 2, pp. 157–172, 2019, doi: 10.5614/jpwk.2019.30.2.5. [CrossRef] [Google Scholar]
  • [18] F. Kurniawan, S. W. Mudjanarko, and S. Ogunlana, “Best practice for financial models of PPP projects,” Procedia Eng, vol. 125, pp. 124–132, 2015, doi: 10.1016/j.proeng.2015.11.019. [CrossRef] [Google Scholar]
  • [19] R. Kurniawan, S. Hasibuan, and R. E. Nugroho, “Kurniawan At All 252-266 MIX,” Jurnal Ilmiah Manajemen, vol. VII, no. 2, pp. 252–266, 2017. [Google Scholar]
  • [20] M. M. Mohammad and K. M. Thajil, “Using financial modeling to trade-off between financial strategies,” Financial Statistical Journal, vol. 6, no. 1, Sep. 2023, doi: 10.24294/fsj.v6i1.2203. [Google Scholar]
  • [21] R. Suwarti, S. S. Moersidik, and T. E. B. Soesilo, “Environmental & Economic Valuation of Raw Water Resource of East Flood Canal DKI Jakarta,” IOP Conf Ser Earth Environ Sci, vol. 306, no. 1, 2019, doi: 10.1088/1755-1315/306/1/012012. [Google Scholar]
  • [22] A. Rahmalia, F. A. Hasani, D. Purwanto, and W. Kushardjoko, “Analisa Kelayakan Pembangunan Jalan Tol Pemalang Batang,” Jurnal Karya Teknik Sipil, vol. 5, no. 1, pp. 11–24, 2016. [Google Scholar]
  • [23] Y. D. Suwandari and M. Mirnayani, “Evaluation of Historical Building Economic Value To Improve Company Revenue With Value Engineering Method,” Jurnal Teknik Sipil dan Perencanaan, vol. 23, no. 1, pp. 1–8, 2021, doi: 10.15294/jtsp.v23i1.25944. [CrossRef] [Google Scholar]
  • [24] D. Keysser, “Analyzing-financial-feasibilty-Keysser,” 2021. [Google Scholar]
  • [25] L. Septiandy and R. A. Rahadi, “FEASIBILITY FINANCIAL ANALYSIS OF COMMERCIAL AREA INVESTMENT AT XYZ AIRPORT,” 2020. [Online]. Available: http://ejournal.um.edu.my/publish/JSCP/14 [Google Scholar]
  • [26] S. Y. Siregar, “Financial feasibility of business towards application-based business: a case study of Drykeun,” 2024. [Google Scholar]
  • [27] M. Mahboubi, R. Sedaeesoula, S. Lari, and P. Moussavi, “An integrated risk and productivity assessment model for public – private partnership projects using fuzzy inference system,” Decision Analytics Journal, vol. 10, no. November 2023, p. 100376, 2024, doi: 10.1016/j.dajour.2023.100376. [CrossRef] [Google Scholar]
  • [28] S. Zhang and R. Leiringer, “Closing capability gaps for procuring infrastructure public-private partnerships: A case study in China,” International Journal of Project Management, vol. 41, no. 6, p. 102497, 2023, doi: 10.1016/j.ijproman.2023.102497. [CrossRef] [Google Scholar]
  • [29] Y. M. I. Amedanou, “Financing the economy in debt times: The crucial role of public–private partnerships,” Research in Economics, vol. 77, no. 3, pp. 295–309, 2023, doi: 10.1016/j.rie.2023.05.003. [CrossRef] [Google Scholar]
  • [30] M. González-Medrano, T. G. Martín, and J. M. Rotellar-García, “Success Factors in Public–Private Partnership of High-Speed Railway Infrastructures: Elements for Improvement,” Springer Proceedings in Business and Economics, vol. 72, no. 2022, pp. 195–203, 2023, doi: 10.1007/978-3-031-22749-3_12. [CrossRef] [Google Scholar]
  • [31] X. Quan and M. C. W. Solheim, “Public-private partnerships in smart cities: A critical survey and research agenda,” City, Culture and Society, vol. 32, no. August 2021, p. 100491, 2023, doi: 10.1016/j.ccs.2022.100491. [CrossRef] [Google Scholar]
  • [32] K. Othman and R. Khallaf, “Renewable energy public-private partnership projects in Egypt: Perception of the barriers and key success factors by sector,” Alexandria Engineering Journal, vol. 75, pp. 513–530, 2023, doi: 10.1016/j.aej.2023.06.009. [CrossRef] [Google Scholar]
  • [33] K. Wang, Y. Ke, and S. Sankaran, “Social sustainability of aged care public-private partnership projects in China: Critical practices and realisation paths,” J Clean Prod, vol. 422, no. June, p. 138644, 2023, doi: 10.1016/j.jclepro.2023.138644. [CrossRef] [Google Scholar]
  • [34] L. Kumar, A. Jindal, and N. R. Velaga, “Financial risk assessment and modelling of PPP based Indian highway infrastructure projects,” Transp Policy (Oxf), vol. 62, no. February, pp. 2–11, 2018, doi: 10.1016/j.tranpol.2017.03.010. [CrossRef] [Google Scholar]
  • [35] J. M. Andrić, J. Wang, and R. Zhong, “Identifying the critical risks in railway projects based on fuzzy and sensitivity analysis: A case study of Belt and Road Projects,” Sustainability (Switzerland), vol. 11, no. 5, 2019, doi: 10.3390/su11051302. [Google Scholar]
  • [36] A. Priya, “Case Study Methodology of Qualitative Research: Key Attributes and Navigating the Conundrums in Its Application,” Sociol Bull, vol. 70, no. 1, pp. 94–110, 2021, doi: 10.1177/0038022920970318. [CrossRef] [Google Scholar]
  • [37] Y. N. Sanda, N. A. Anigbogu, Y. D. Izam, and L. Y. Nuhu, “Designing Case Study Research In Construction Management,” Journal of Surveying, Construction & Property, vol. 12, no. 1, pp. 27–35, Jun. 2021, doi: 10.22452/jscp.vol12no1.3. [CrossRef] [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.