SWOT analysis as a strategic tool for developing the quality management system of an educational organization
1
Institute of pharmacy, chemistry and biologyvBelgorod State National Research University Belgorod, Russia
2
Institute of Economics and Management Belgorod State National Research University Belgorod, Russia
* Corresponding author: spichak@bsu.edu.ru
The article discusses the need to implement effective risk management tools in the quality management system of an educational organization, due to the increasing requirements of the external environment, increasing competition, and the globalization of the educational space. The main focus is on SWOT analysis as one of the reliable and effective tools for qualitative analysis of the organization’s strengths and weaknesses, opportunities and threats. The article highlights the features of using SWOT analysis in the process of risk management of an educational organization.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
1 Introduction
The current stage of development of the management system in the field of education is characterized by the consequences of internationalization and globalization of the educational space, increased competition, increasing instability and uncertainty of the external environment, for which it is necessary to create adequate diagnostic procedures for risk situations, management methods and tools, and create new requirements for the qualification of personnel. To do this, risk management tools are increasingly used, which is an integral part of strategic management in an educational organization, and allows to determine possible deviations from the planned results of activities and predict the onset of risk events in time.
Recently, it has become obvious that new methods and technologies of risk management in educational organizations should be used instead of the old ones, which have already lost their strength and effectiveness. In this regard, educational organizations tend to focus on the needs and requirements of stakeholders, diagnose risk events at an early stage, and provide for the impact of negative consequences of risk situations at the stage of planning educational activities.
Risk management should be carried out at various levels – this will allow to best control risks and take preventive measures. Thus, risk management should be an integrated system, not an independent one.
Integrated risk management is a new concept of risk management, which is a structured and consistent approach characterized by pooling resources in order to reduce uncertainties in relation to a changing set of risks through the integration of a risk management system and a system of operational and strategic management [1].
The main features of an integrated approach to risk management in an educational organization are:
Continuity of the risk management process.
Coverage of all types of activities the entire set of risks of an educational organization and possible measures for their management are considered.
Risk management is considered as a separate structural element integrated into the overall management system.
Coordination by senior management and active use of motivation tools for personnel involved in risk management.
Using a variety of methods and tools to identify and assess risks, as well as opportunities that arise during the implementation of a risk event in order to influence them to enhance the expected positive effect or minimize negative consequences.
2 Main part
To identify risks and opportunities of an educational organisation, their ratings and further define actions for dealing with them, it mainly uses the analysis of various documentation and numerous methods and tools for collecting information (some of them are brainstorming, Delphi method, expert survey, analogy method, and SWOT analysis). Then the risk assessment is performed, and we compare the results of the risk analysis with the established criteria to determine whether the risk and its probability are acceptable or reasonable. This contributes to making a decision about the impact on risk.
Risk assessment should be performed at least once a year. The probability of risk can be determined on a 5-point scale (Table 1).
The acceptable limit in BSU is the average probability of risk. Risks below the acceptable limit may be accepted without a risk management plan. Otherwise, risk management actions are developed and should be documented.
The next step after the risk assessment is to analyse the factors for the probability of risks, their impact, proximity and expected price of the risk event [2].
Quantitative and qualitative methods can be used in assessing the identified risks.
Quantitative risk assessment consists in determining the numerical values corresponding to general and individual risks and ranking them by the degree of influence. Quantitative analysis allows to calculate the numerical values of the possibility of occurrence of risk events and their consequences, during its conduct, permits to made quantitative assessment of the degree of risk events and to identify the level of risk possible in a particular situation.
Qualitative risk assessment involves identifying the interdependence between the causes and risk factors, and assessing the conditions for their occurrence. It means determining the sources and causes of risk; forming stages and works in which the risk appears; identifying all possible risks; calculating profit and loss when making a risk decision. The qualitative analysis is based on the conclusions of experts (risk managers), as a result of which the subjectivity of such assessments reduces the validity of the results obtained. An additional increase in the reliability of the analysis results can be achieved by quantitative structuring of the estimated factors.
One of the most effective expert methods of qualitative risk analysis is SWOT analysis an approach based on comparing the opposite qualities of the evaluated object. The results of SWOT analysis are formalized in the form of a table containing four sections and allowing you to clearly contrast the strengths and weaknesses of the organization, its opportunities and threats.
Based on the structural analysis, further research is conducted, including ranking of the identified factors and pairwise combination of strengths and weaknesses of the educational organization, its opportunities and threats. All this is reflected in the compilation of four lists: 1) opportunities built on the strengths of the project; 2) strengths that can be reduced by the possibility of threats; 3) weaknesses that do not allow you to use the capabilities of the organization; 4) project weaknesses that make the organization vulnerable to threats. Then measures are developed to overcome the most serious weaknesses and counter the most powerful threats [3].
Scale evaluation of risk events probability
3 Results and discussion
The following table (Table II) shows the results of the SWOT analysis of BSU as of 01.01.2020, taking into account the specifics of educational activities, which were worked out by the quality commissioners of BSU. After identification of threats, their assessment and analysis, the stage of choosing the method of exposure to risks comes, which is carried out mainly in two ways: reduction and preservation. Reducing risk implies reducing either the extent of possible damage or the likelihood of adverse events. There are three main ways to reduce risk.
Rejection of risk (avoidance of an event associated with risk, refusal of any operations/investments that carry an unacceptable risk for the educational organization, and therefore refusal of profit).
Reduction of risk (reservation, limitation, distribution, minimization).
Transfer of risk (insurance, hedging, and distribution). It is important to note that this method is rarely used by educational organizations. Risk transfer measures mean transferring responsibility for it to third parties while maintaining the existing level of risk.
Keeping the risk at the existing level, which means creating special reserve funds that will contain funds to compensate for losses in the event of adverse events, is also rarely used in the practice of Russian universities.
Risk management is determined by the effectiveness of the interaction process between all stakeholders in risk management. Risk management is carried out both in the internal and external educational environment, which confirms the need to interact with internal and external participants in this process.
Risk management in higher education requires a clear distribution of powers and responsibilities that are necessary for making management decisions. In order to ensure full risk management, it is important first of all to establish effective interaction within the educational organization. Risk management is the responsibility of the top management. Its prerogative is to distribute responsibility and authority among the relevant employees. Decisions made in the risk management process must meet the requirements of Russian legislation and quality objectives. It is important to establish an optimal balance between the level of risk responsibility and the ability to control this risk [4].
The risk management process in the quality management system of BSU can be represented as follows.
The quality management center summarizes information about risks, opportunities and defining actions for handling them in the processes of production and service delivery, procurement management and annually includes it in the draft report on the analysis of the quality management system by management.
Actions to manage and identify risks and opportunities in the form of events are reflected in the University’s development strategy, in the road maps of target programs, in the work plans of the University and its structural divisions, in lists of instructions from the rector and academic Council, and so on.
The heads of structural divisions together with the quality commissioners during planning, at least once a year, determine which of the factors identified in the SWOT analysis are the most important and can have a significant impact on the ability of the division to provide educational services that meet the requirements of consumers and applicable legal and regulatory requirements. Actions to deal with the assessed risks and opportunities in the form of measures aimed at minimizing risks and maximizing available opportunities are included in the quality assurance plan of the relevant process in order to prevent or reduce the undesirable impact of risks, eliminate the reasons for preventing their recurrence, use existing opportunities to ensure continuous improvement of the University’s quality management system in general and its structural divisions in particular.
The assessment of actions to handle risks and opportunities effectiveness is carried out at the end of the academic year by making a record of the risk probability assessment by the head of the process in the structural divisions after the Introduction of risk management measures in the “Completed” column of the quality assurance plan on a five-point scale: “1”, “2”, “3”, “4”, “5”. If a risk event still occurred and had a negative impact on the activities of the educational organization, the risk event receives the status of “problem”. Such problems are recorded in a special register. Educational organizations that implement lean manufacturing tools use visual boards with information about problem management. These visual boards usually contain a brief description of the problem, the owner of the problem, the place and time of its occurrence, the severity of the problem, the necessary actions and deadlines for solving it, the status of actions and the status of the problem [5].
The effectiveness of processes in relation to risks and opportunities is reflected in: reports on the analysis of the quality management system by management at the level of both structural divisions and the University as a whole; in the report on the results of self-examination of BSU in the framework of collecting information when Monitoring the effectiveness of higher education institutions.
Results of SWOT analysis for BSU on 01.01.2020
4 Conclusions
Thus, we can conclude that the operating environment of educational organizations is currently characterized by accelerated changes, globalization, instability, and constantly increasing requirements for the quality of services, which requires the use of effective strategic tools and risk management methods.
The success of identifying risks and opportunities in the implementation of risk management depends on the use of various approaches to risk assessment and analysis, one of which is SWOT analysis. In the process of risk management, participation and interaction of all employees of the educational organization is of great importance, which requires a high level of communication development at the University and a high organizational culture. Identification of risks and opportunities should become an integral part of the quality management system of educational organizations and contribute to their continuous improvement and dynamic development.
References
- V. Khmyrov, Social and political Sciences, 3, 82-85 (2013) [Google Scholar]
- L. Kanaeva, Research result. Sociology and management, 4, 42-46 (2015) [Google Scholar]
- V. Podgornov, Bulletin of the Adygeya State University. Series 5: Economics, IV, 309-314 (2012) [Google Scholar]
- O. Golub, Bulletin of the Saratov state socioeconomic University, 2, p. 142–145 (2012) [Google Scholar]
- V. Ivanov, A. Selezneva, Vestnik of Samara State Technical University. The Series: Psychology and Pedagogics, 1, 70-77 (2015) [Google Scholar]
All Tables
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.