Open Access
Issue |
BIO Web Conf.
Volume 97, 2024
Fifth International Scientific Conference of Alkafeel University (ISCKU 2024)
|
|
---|---|---|
Article Number | 00025 | |
Number of page(s) | 11 | |
DOI | https://doi.org/10.1051/bioconf/20249700025 | |
Published online | 05 April 2024 |
- Mostafa Sakr et al., Optimization of Repetitive Projects Scheduling in Construction Analysis for the State - of - Art Methods, Journal Of Al-Azhar University Engineering Sector, 2021 [Google Scholar]
- Harris R.B., Ioannou P.G. Repetitive scheduling method. Center For Construction Engineering and Management, Michigan. 1998 Nov. [Google Scholar]
- Vanhoucke M. Work continuity constraints in project scheduling. Journal of Construction Engineering and Management. 2006 Jan;132(1):14–25. [CrossRef] [Google Scholar]
- Bennett F.L. The management of construction: A pro-ject lifecycle approach. Routledge; 2007 Jun 1. [CrossRef] [Google Scholar]
- Uher T.E. Programming and Scheduling Techniques (Construction Management). University of New South Wales Press (UNSW); 2003. [Google Scholar]
- Agrama F.A. Linear projects scheduling using spread-sheets features. Alexandria Engineering Journal. 2011 Jun 1;50(2):179–185. [CrossRef] [Google Scholar]
- Mubarak S.A. Construction project scheduling and control. John Wiley & Sons; 2015 Mar 23. [Google Scholar]
- Sullivan A., Harris F.C. Delays on large construction projects. International journal of operations & production management. 1986 Jan 1;6(1):25–33. [CrossRef] [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.