Open Access
Issue |
BIO Web Conf.
Volume 107, 2024
19th International Conference Water and Wastewater: Transportation, Treatment, Management “Yakovlev Readings” (YRC-2024)
|
|
---|---|---|
Article Number | 06004 | |
Number of page(s) | 9 | |
Section | Technology and Organization of Construction | |
DOI | https://doi.org/10.1051/bioconf/202410706004 | |
Published online | 07 May 2024 |
- 6. (54) R. Politi, E. Aktaş, E. İlal, Project Planning and Management Using Building Information Modeling (BIM), 13th International Congress on Advances in Civil Engineering, 12-14 September 2018, Izmir/TURKEY (2018) [Google Scholar]
- 17. (70) G.A. Sentosa et al, IOP Conf. Ser.: Earth Environ. Sci. 1169 012033 (2023). DOI 10.1088/1755-1315/1169/1/012033 [CrossRef] [Google Scholar]
- 0. (58) R. Charef, H. Alaka, S. Emmitt, Beyond the third dimension of BIM: A systematic review of literature and assessment of professional views, Journal of Building Engineering, 19, 242-257 (2018), https://doi.org/10.1016/j.jobe.2018.04.028 [CrossRef] [Google Scholar]
- 24. (14) V.V. Filatov, A.D. Pestrikova, L.A. Adamtsevich, Domestic Experience in the Development of Information Modeling Technologies. Promyshlennoe i grazhdanskoe stroitel'stvo [Industrial and Civil Engineering], 9, 80-87 (2023). (In Russ.). DOI: 10.33622/0869-7019.2023.09.80-87 [CrossRef] [Google Scholar]
- 9. (60-1) D. Briskorn, M. Dienstknecht, Mixed-integer programming models for tower crane selection and positioning with respect to mutual interference, European Journal of Operational Research, 273, Issue 1, 160-174 (2019), https://doi.org/10.1016/j.ejor.2018.07.033 [CrossRef] [Google Scholar]
- 10. (60-2) Y. Ji, F. Leite, Automated tower crane planning: leveraging 4-dimensional BIM and rule-based checking. Automation in Construction, 93, 78-90 (2018). DOI:10.1016/j.autcon.2018.05.003 [CrossRef] [Google Scholar]
- 11. (60-4) M. Lucarelli, E. Laurini, P. De Berardinis, 3D and 4D modelling in building site working control, Int. Arch. Photogramm. Remote Sens. Spatial Inf. Sci.,XLII-2/W9, 441–446 (2019), https://doi.org/10.5194/isprs-archives-XLII-2-W9-441-2019 [Google Scholar]
- 15. (67) K. Hyunjoo, A. Hongseob, Temporary Facility Planning of a Construction Project Using BIM (Building Information Modeling), Computing in Civil Engineering, 627-634 (2011). https://doi.org/10.1061/41182(416)77 [Google Scholar]
- 12. (61) S.S. Kumar, J.C.P. Cheng, A BIM-based automated site layout planning framework for congested construction sites, Automation in Construction, 59, 24-37 (2015), https://doi.org/10.1016/j.autcon.2015.07.008. [CrossRef] [Google Scholar]
- 14. (66) K. Schwabe, S. Liedtke, M. König, J. Teizer, BIM-based Construction Site Layout Planning and Scheduling, 16th International Conference on Computing in Civil and Building Engineering, 679-686 (2016), http://www.see.eng.osaka-u.ac.jp/seeit/icccbe2016/Proceedings/Full_Papers/086-352.p df [Google Scholar]
- 8. (60) R. Kontrimovičius, L. Ustinovichius, BIM-based prototype of a mathematical model of construction planning, Journal of Civil Engineering and Management, 29(1), 1–14 (2023). DOI:10.3846/jcem.2023.18313. [CrossRef] [Google Scholar]
- 16. (68) B.F. Silveira, D.B. Costa, Method for automating the processes of generating and using 4D BIM models integrated with location-based planning and Last Planner® System, Construction Innovation, Vol. ahead-of-print No. ahead-of-print. (2023). https://doi.org/10.1108/CI-02-2022-0030 [Google Scholar]
- 1. (44) P.B. Kagan, Improving the effectiveness of organizational and technological design in construction due to its modernization using modern digital technologies, Russian Journal of Resources, Conservation and Recycling, [online] 1(7) (2020). Available at: https://resources.today/PDF/09INOR120.pdf (in Russian). DOI: 10.15862/09INOR120 [Google Scholar]
- 5. (15). Sh. Staub-French, A. Khanzode, 3D and 4D modeling for design and construction coordination: Issues and lessons learned, Electronic Journal of Information Technology in Construction, 12, 381-407 (2007) [Google Scholar]
- S.I. Pimenov, Construction information model, Construction and Geotechnics, 13, 3, 72-84 (2022). DOI:10.15593/2224-9826/2022.3.07 [Google Scholar]
- 7. (56) L.A. Oparina, Application of information modelling technologies for construction time management, Smart Composite in Construction, 2, 2, 48-55 (2021). DOI 10.52957/27821919_2021_2_48 [CrossRef] [Google Scholar]
- 3. (49) A.V. Skvorcov, BIM data models for infrastructure, SAPR i GIS avtomobil'nyh dorog [CAD and GIS of highways], 1(4), 16-23 (2015). (In Russ.). DOI:10.17273/CADGIS.2015.1.2 [Google Scholar]
- 13. (62) A. Sampaio, N. Gomes, A. Gomes, A. Sanchez-Lite, Multi-Project in an Integrated BIM Model: Clash Detection and Construction Planning, Journal of Software Engineering and Applications, 15, 345-358 (2022). doi: 10.4236/jsea.2022.1510020. [CrossRef] [Google Scholar]
- 18. (71) O. Doukari, B. Seck, D. Greenwood, The efficient generation of 4D BIM construction schedules: A case study of the Nanterre 2 CESI project in France. Front. Built Enviro, 8:998309 (2022). DOI: 10.3389/fbuil.2022.998309 [CrossRef] [Google Scholar]
- 19. (75) F.B. Vargas, F.S. Bataglin, C.T. Formoso, Guidelines to Develop a BIM Model Focused on Construction Planning and Control, 26th Annual Conference of the International Group for Lean Construction, 744-753 (2018). DOI: http://doi.org/10.24928/2018/0450 [Google Scholar]
- 21. (80) V.M. Lebedev, System engineering and system components of construction production [Sistemotekhnika i sistemokvanty stroitel'nogo proizvodstva], Moscow, INFRA-M, 226 p. (2019). (In Russ.). [Google Scholar]
- 22. Order of the Ministry of Construction of Russia dated 18.07.2022 №577/pr “On approval of the Methodology for the development of estimate standards”, https://minstroyrf.gov.ru/docs/226103/ [Google Scholar]
- 23. L.A. Тsvetkova, T.R. Zabalueva, The comparative analysis of russian and foreign standards regulating the creation of planning solutions of rehabilitation centers for people with disorders of the musculoskeletal system, International Research Journal, 3(45), 43-47 (2016). DOI: 10.18454/IRJ.2016.45.024 [Google Scholar]
- 20. (77) V.M. Lebedev, G.V. Belikova, Modeling construction of monolithis concrete floors taking into account organizational - technological reliability, The Bulletin of BSTU named after V.G. Shukhov, 3, 51-56 (2017). DOI: 10.12737/25047 [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.